A fake AI-generated flood photo forced KeNHA to publicly defend its Sh2 billion Greenpark pedestrian underpass project.
That viral image was completely bogus
That viral image was completely bogus
- KeNHA confirmed the flooded-underpass photo is AI-generated.
- It popped up during ongoing rains and sparked online outrage.
- The agency urged Kenyans to verify posts before sharing them.
- Actual drainage systems are built to handle Nairobi's weather.
- A collection chamber captures any water entering the facility.
- Specialized pumps then clear the gathered water.
- Entry points sit at a raised elevation to block runoff.
- Engineers designed everything around local rainfall patterns.
- Four major underpasses will serve over 21,000 pedestrians daily.
- The official opening for the Greenpark tunnel is slated for June.
- It separates foot traffic from heavy vehicles at Uhuru Highway.
- The location sits at the Haile Selassie Avenue junction in Nairobi.
- A dedicated aeration system keeps fresh air circulating underground.
- Clean public washrooms and organized vendor stalls are included.
- Continuous security monitoring covers all operating hours.
- Pedestrian safety within the CBD gets a major upgrade.