TANROADS shot down social media claims about substandard construction on the Dodoma-Gairo trunk road near Makaravati in Kongwa District after people started freaking out online. Resident Engineer Elisony Mweladzi explained the 300-meter stretch was a deliberate test section that contractors built before laying actual asphalt, and lab results showed it failed specs. The agency already sent Kings Builders a letter demanding they rip out the failed test piece at their expense.
Edward Njau from Kings Builders confirmed they got the correction notice and promised to fix everything fast. TANROADS keeps watching the contractor to make sure the final road meets approved standards and does not waste public money on garbage work.
Edward Njau from Kings Builders confirmed they got the correction notice and promised to fix everything fast. TANROADS keeps watching the contractor to make sure the final road meets approved standards and does not waste public money on garbage work.